Continue your preparation

You left 0 items in your selection. Review current prices and availability before checkout.

Review my selection
RuleMithraRAILWAY EXAM PREPARATIONGet started

THE EXAMINATION COLLECTION

AME / AWM — Mechanical & Workshop Group B

Group B promotion preparation: 70% selection / 30% LDCE, subject to the applicable notification. Source-backed subject practice is supplementary; current syllabus, eligibility, amendments and examination scheme require verification. Unapproved questions remain unpublished.

1 published mock testsTimed practiceAnswer review

Free launch: all published mocks are currently free with an account. One eligible free mock per exam is available without sign-in. Try it now →

PRACTISE WITH PURPOSE

Your mock tests

01
01
TRY WITHOUT SIGN-IN

AME / AWM — Mechanical & Workshop Group B — Subject Practice 01

100 questions100 minutes
Try now

STAY IN THE LOOP

Your preparation. Our updates.

Follow the RuleMithra WhatsApp channel for the updates we share with our learning community.

Follow our WhatsApp channelChoose your department community
Scan to open the RuleMithra WhatsApp channel
Scan to follow RuleMithra

CURATED FOR YOUR EXAM

Books for this exam

Browse the library

A new chapter is on its way.

Published books will appear here when their shop listings are ready. You can explore available online tests in the meantime.

Explore exams

KNOW WHAT TO PREPARE

Syllabus & study outline

AME — 70% Selection preparation: source-based practice syllabus (October 2026)

Reviewed syllabus
01Stores and workshop administration · 11.67%
  • Stores classification, indenting, procurement, delegated powers, receipt inspection and scrap disposal
02Divisional working and emergencies · 11.67%
  • Timetables, control working, passenger grievances, accident management, investigation and relief cranes
03Diesel traction · 11.67%
  • Locomotive features, maintenance, troubleshooting, fuel, cooling, lubrication, braking, electrical equipment and safety; distributed-power stock
04Carriage and wagon · 11.67%
  • Coach and wagon maintenance, bogies, bodies, corrosion, couplers, brakes, passenger amenities, fire prevention, examination policies and new designs
05Workshops and production units · 11.66%
  • Labour accountal, incentives, machine tools, welding, heat treatment, bearings, materials handling, production layouts and plant maintenance
06Official language revision · 11.66%
  • Official language questions are optional in the cited syllabus; confirm the current notification and chosen technical stream before a model paper is published
07Establishment rules · 15%
  • Personnel organisation, recruitment and training; service conditions, manpower planning, conduct and discipline, retirement, welfare, industrial relations and personnel IT
08Financial rules · 15%
  • Financial propriety, budgets, allocation and control; works justification, stores finance, costing, tenders, audit, powers, losses, GFR, GeM, revenue, taxation and government audit organisation
Official reference / notification source ↗

Syllabus

Reviewed syllabus
01Establishment Rules
  • Organization of the Personnel Department in Railways, objectives, functions, and policies of the Personnel Department
  • Recruitment and Training, Classification of Services, Recruitment in Different services, Railway Recruitment Boards & Railway Recruitment Cells
  • Compassionate Ground Appointments, Initial & In Service Training, Refresher Courses, Central Training Institutes, Training Centers in Zones, Divisions & Workshops, Training Modules for different posts, Training under Apprentices Act, Online Training, APARS
  • General conditions of service in Railways, Seniority, Lien, Inter Railway & Inter Division transfers, Deputation, Promotion Policy & methods
  • Selection, Suitability, Trade Tests, Leave Rules, Pass Rules, Joining Time, Reservation policy, HOER, Overtime, Payment of wages, current CPC Pay Rules, Advances in Railways
  • Manpower planning, Rightsizing & Benchmarking, creation, extension and surrender of posts, creation of posts against new assets, different types of posts including workcharged posts
  • The Railway Servants (Discipline & Appeal) Rules, 1968 and related instructions
  • The Railway Services (Conduct) Rules, 1966 and related instructions
  • Retirement benefits, qualifying service, pension, family pension, commutation, gratuity, new pension scheme
  • Staff welfare, SBF, Railway institutes, Railway schools, Ex-gratia payment, Incentive Bonus Scheme, Staff Grievances Redressal Mechanisms
  • Industrial relations in Railways, recognized trade unions, industrial disputes
  • The Industrial Disputes Act, 1947, The Industrial Relations Code, 2020, The Trade Unions Act, 1926, PNM, PREM, JCM, Various Associations & Informal Meetings
  • The Factories Act, 1948, The Workmen's Compensation Act, 1923, Functions of Labour Enforcement Officers, Right to Information Act
  • The scope of Information Technology in Railway office: HRMS, IPAS, LIMBS, ARPAN, CPGRAMS, ANUBHAV etc.
02Financial Rules
  • Parliamentary Control over Railway Finance, Public Accountability, Cannons of Financial Propriety
  • Railway Budget: Budgetary terms, Types of Budgets, Budget cycle, Demand of Grants, Budgetary and Financial Reviews
  • Rules of Allocation, Classification of expenditure, Control of expenditure, Responsibility Accounting, Performance Budgeting, Exchequer Control, Financial Results of Working lines
  • Works Programme, Financial justification of Works, Surveys, Preparation of Estimates, Capital Budget, Control over Capital Expenditure, Reappropriation of Funds
  • Financial control over Stores Expenditure, Purchase and Stores Keeping Procedure, Inventory Control and ABC Analysis
  • Financial & Cost Control in Railway Workshops/Sheds/Units
  • Rules and procedure relating to Tenders and contracts for execution of works and Procurement of Stores, M&P Programme and RSP
  • Procedure for Possessing and finalizing Audit Objections and Draft Paras
  • Delegation of Powers
  • Losses, Frauds and Embezzlements
  • General Financial Rules
  • Government e-Market (GeM)
  • Classification of Railway Revenue (Earnings)
  • Information Technology in general with specific reference to Railway's IT Applications
  • Taxation matters with special focus on GST & Income Tax
  • Organization of CGA and C&AG
  • Any other topic felt necessary from time to time
03Section A: General Knowledge & Quantitative Aptitude
  • General Knowledge: Questions of general interest and importance acquired by general observation and reading without specific textbook study (Matrix standard), including subjects of national importance and railway achievements
  • Quantitative Aptitude: Arithmetic & Statistical Operations, Graphs, Fractions, Percentage, Sampling & Averages
  • Geometry (Area & volume up to Higher Secondary/Class 12 Standard)
  • Algebra, simultaneous equations, etc. (up to Higher Secondary/Class 12 Standard)
  • General quantitative aptitude
04Section A: Applied Mechanics & General Science
  • Applied Mechanics: Various Engineering materials and their properties, Bearings, Stress & Strain, Fatigue, Hardness, Corrosion & Surface finish
  • Mechanics: Newton's Laws of Motion, Velocity & Acceleration, work, energy, power, Archimedes' Principle, etc. (with velocity, acceleration, work done & horse power up to Class 12 standard)
  • Temperature & its measurement, Heat & Work, Expansion of Solids, Liquids & Gases
  • IC Engines, Gas Turbines, Heat Recovery & Thermal Efficiency, Supercharging & Intercooling
  • Ohm's Law, Coulomb's Law, Faraday's Laws, Voltage, Current & Resistance, wet & dry batteries, power factor
  • Simple Motors & Dynamos (Principle & working), transformer, relay, fuse, circuit breakers
  • Power Supply (AC & DC, Rectification)
05Section A: Information Technology & EnHM
  • Familiarity with Personal Computer Specs (Processor, RAM, Hard Disk, CD, Multimedia, etc.)
  • Basic MS Word, Excel, and PowerPoint
  • Basic Local Area Networks: Servers, Hubs, Switches, Structured Cabling, Nodes, Network applications
  • Using Internet: Email, Browsing, Searching
  • General Information on various portals used in Indian Railways including GeM, UDM, IREPS, FMM, E-Office, etc.
  • Environment, Quality Management Systems (ISO 9000 & ISO 14000), Environment management system (ISO 14001)
  • Solid waste management rules
  • CTE (Consent to Establish), CTO (Consent to Operate)
  • Water Act, Air Act, Hazardous Waste Management Act
  • Water policy of Indian Railways
06Section B: Part-A: Stores Rules
  • Classification of Stores
  • Procedure of drawal of Stores & Indenting Procedures
  • Procurement methods (Local purchase, Spot purchase, Bulletin tender, Advertised tender, Limited tender, Tender Committee, Direct Purchasing)
  • Schedule of Powers
  • Incoming inspection requirements & Scrap disposal
07Section B: Part-B: Divisional Working & Operations Management
  • Working Time Table
  • Working in Control Office including Passenger grievance redressal portals e.g., Rail Madad
  • Accident Classification, definitions, ART Ordering, Role of Supervisors & officers at accident site management, Accident investigation including proforma for measurement
  • 140-ton Crane Construction & safety in operations
08Section B: Part-B: Diesel Locomotives
  • Basic Features and troubleshooting of HHP locomotives
  • Preventive maintenance schedules & Latest design improvements in diesel locomotives to reduce failures on line
  • Features of GE Locomotives & Design improvements in bogies for high-speed operation
  • Air Brake system of diesel locos including working of compressors and vigilance control devices and their maintenance
  • Cooling water system, fuel oil system, and control of lubricating oil consumption of diesel engines
  • Safety devices used on diesel engines/locomotives, Trouble shooting on running locomotives, Fuel Economy, and Thermal loading of engine components
  • Under gear maintenance, suspension bearings, wheels, and Electric Systems of Diesel Locomotive
  • Load Box Testing
  • MEMU, DEMUs (types, systems & troubleshooting)
  • Basics of DPRS (Distributed Power Rolling Stock) & Introduction to GM Locomotives and its systems
09Section B: Part-B: Carriage & Wagon
  • Coaching stock preventive maintenance schedules in Coaching Depots including IOH, POH, SS2, SS3 Schedules in shops
  • Wagon stock preventive maintenance including ROH in depots and POH Schedule in shops, Ride Index, Anti-Telescopic features
  • IRCA Rules for rejectable defects
  • ICF & LHB Coach Bodies and their maintenance in sick line/shops
  • Generic details of train set, Casnub Bogie & its modifications for high speed
  • Corrosion repairs to coaching and goods stock
  • Couplers & Draw gear, Train Parting, Brake Binding & measures to avoid the same
  • Water availability in coaches & Fire prevention on trains
  • Air Brake System (Twin Pipe & single pipe, Underframe & bogie-mounted brake system, Test rig, Checking timings, troubleshooting, DV defects, slack adjustment methods, WSP system, FIBA, Air spring suspension in LHB coaches)
  • Passenger amenity items, OBHS, CTS, and other coach cleaning systems
  • Maintenance Pattern of freight trains including CC Rakes & Coaching stock maintenance including Revised Policy Circular-4
  • Neutral Train Examination & Maintenance of components like DV, SAB, PEASD
  • Latest design improvements of Carriage & Wagons to improve performance and speed potential (LHB Coaches & BLC Wagons)
  • Construction, Design & Maintenance of special purpose Wagons
10Section B: Part-B: Workshops and Production Units
  • System of labour accountal, GA Cards for time keeping documents, tally sheets, Job/Route Cards, inspection & rate fixing
  • Rules & Calculations under incentive scheme
  • Paints & painting systems
  • Different types of machine tools (lathes, milling machines, shapers, planers, cutting tools & cutting speeds) & CNC machines
  • CLW Pattern of Incentive Scheme, Group Incentive Scheme
  • Different types of welding processes, welding defects
  • Wheels, tyres & axles and their ultrasonic testing
  • Heat treatment of ferrous items (surface hardening, annealing, normalizing, etc.)
  • Roller Bearing & Cartridge Bearings
  • Injury-free features in coaches & Material handling
  • Design of coaches and wagons
  • Basic concepts of casting and Heat treatment methods
  • Manufacturing and Heat treatment process of wheels and axles
  • Factory Layout & Process flow chart of Production Units
  • Machinery and Plant maintenance
11Rajbhasha (Official Language Policy)
  • Optional questions of 15 marks
Official reference / notification source ↗
Independent preparation. Always consult current official rules and examination notifications.